|
2004 |
Accomplished |
Provided safety training to employees and students relating to forklifts, skid steer loaders, pesticides, formaldehyde, and hazardous waste compliance |
|
2004 |
Accomplished |
Provided pesticide decontamination stations in remote areas of the North farm. |
|
2004 |
Accomplished |
Improved communications with workers regarding safety issues, training needs and opportunities. |
|
2004 |
Accomplished |
Collected all unused neutron probes and returned them to the manufacturer in order to reduce radioactive exposure issues. |
|
2004 |
Accomplished |
Conducted periodic inspections to address farm machinery and noise hazards, pesticides, hazardous waste, and other safety issues. |
|
2004 |
Accomplished |
Reduced targeted safety and compliance problems during the year by 72% in laboratories and by 47% at farms, greenhouses, and shops as documented by audits from the K-State Research & Extension safety office. |
|
2004 |
Accomplished |
Provided employee medical surveillance including hearing tests, pulmonary function tests, cholinesterase blood tests, and tetanus vaccines. |
|
2004 |
Accomplished |
Conducted department-wide solid waste review. |
|
2004 |
Accomplished |
Installed twelve new eyewash stations and eight new first aid kits in laboratories. |
|
2004 |
Accomplished |
Eliminated hazards due to incompatible chemical storage in eight laboratories. |
|
2004 |
Accomplished |
Conducted a complete clean-out of old chemicals from two laboratories |
|
2004 |
Accomplished |
Eliminated indoor air pollution due to a malfunctioning vacuum pump. |
|
2004 |
Accomplished |
Provided fit tests for employees who wear respirators. |
|
2004 |
Accomplished |
Eliminated hazards related to fire safety. |
|
2004 |
Accomplished |
Initiated development of a procedure to provide standardized safety training based on need for new and existing employees. |
|
2003 |
Accomplished |
Solicited employee input on safety by means of a survey. |
|
2003 |
Accomplished |
Conducted a thorough review and update of pesticide safety practices at all sites in compliance with EPA’s Worker Protection Standard. |
|
2003 |
Accomplished |
Installed personnel chemical decontamination kits on all tractors. |
|
2003 |
Accomplished |
Posted signs to indicate tornado refuge areas. |
|
2003 |
Accomplished |
Posted hazardous waste safety information in all labs and shops where chemicals are used. |
|
2003 |
Accomplished |
Provided fit tests for employees who wear respirators. |
|
2003 |
Accomplished |
Installed 17 new flammable storage cabinets in 32 labs serving 24 faculty members. |
|
2003 |
Accomplished |
Installed a clothes washer and clothes dryer at the North Agronomy Farm for use in cleaning protective clothing. |
|
2003 |
Accomplished |
Provided employee medical surveillance including hearing tests, pulmonary function tests, cholinesterase blood tests, and tetanus vaccines. |
|
2003 |
Accomplished |
Performed a safety walk-through of farm operations. |
|
2003 |
Accomplished |
Repaired malfunctioning laboratory fume hoods. |
|
2003 |
Accomplished |
Conducted chemical safety and hazardous waste inspections in all laboratories and farm operations, helped employees resolve chemical safety issues, and disposed of waste chemicals through K-State Public Safety. |
|
2003 |
Accomplished |
Provided chemical spill control supplies to areas where chemicals are used. |
|
2003 |
Accomplished |
Revised pesticide rinsate procedures. |
|
2003 |
Accomplished |
Provided the following training to employees and students: pesticide worker protection standard training, Farm Bureau distracted driver training, lab safety, chemical spill control, and hazardous waste disposal. |
|
2003 |
Accomplished |
Installed safety showers and eyewash stations at the North Agronomy Farm and Ashland Research Farm. |
|
2003 |
Accomplished |
Improved maintenance shop lighting at the Ashland Research Farm and the North Agronomy Farm. |
|
2002 |
Accomplished |
Developed an emergency action plan, including evacuation routes, safe assembly areas and faculty/staff emergency responsibilities. |
|
2002 |
Accomplished |
Improved pesticide safety in the Throckmorton greenhouses, and provided pesticide safety training to students and employees. |
|
2002 |
Accomplished |
Established a self-inspection procedure for periodically reviewing and improving hazardous waste handling, storage, and disposal practices. |
|
2002 |
Accomplished |
Provided medical surveillance related to hearing conservation, respiratory protection, and pesticides to affected employees. |
|
2002 |
Accomplished |
Provided safety committee training. |
|
2002 |
Accomplished |
Developed an incident reporting system. |
|
2002 |
Accomplished |
The committee was trained August 28, 2002. |
|
2002 |
Accomplished |
Ergonomics training has been provided to office employees. |
|
2002 |
Accomplished |
Medical surveillance related to hearing conservation, respiratory protection, and pesticides has been provided to affected employees. |
|
2002 |
Accomplished |
Building floor plans have been drawn showing Emergency Evacuation Routes and Safe Assembly Areas for both natural and man-made emergencies and threats. Responsible faculty/staff positions have been designated to notify occupants, clear the building, and expedite evacuation. |
|
2002 |
Accomplished |
The committee is exploring ways to make additional safety training available, particularly to students. |
|
2002 |
Accomplished |
Provided ergonomics training to office employees. |